Ibaraki, Japan · 2024
Rice Methane Reduction through Mid-Season Drainage
The mid-season drainage period was extended by about 7 days, with 1 to 2 drainage events, to cut methane from conventional paddy.
Key facts
- Location
- Ibaraki, Japan
- Status
- Completed 2024
- Scale
- about 100 ha
- Partner
- Rice farming operation / agricultural project partner
What was done
The project extended the mid-season drainage period beyond conventional practice. Water-management changes were implemented to reduce anaerobic conditions in rice paddies and therefore methane emissions. Field management and emission-reduction performance were assessed for carbon-credit potential.
The drainage approach was developed against J-Credit methodology AG-005, which covers extending the mid-season drainage period in rice cultivation. This describes how the project was designed and measured. It is not a statement that J-Credits have been registered or issued for this project.
Results
| Measure | Before | After | Change | Status |
|---|---|---|---|---|
| Methane | about −30% | Reported | ||
| Total GHG | about −1.4 tCO₂e/ha | Reported | ||
| Water use | −10 to 30% | Reported | ||
| Yield | 0 to 3% change | Reported |
Reported figures come from the project's own records; indicative figures are estimates, not verified measurements. Sri Lankan outcomes are subject to baseline assessment.
What it means for Sri Lanka
Demonstrates a relatively simple rice water-management intervention that can reduce methane emissions while maintaining rice production.
Want to know what this could mean for your land?
A short call is usually enough to tell whether an assessment makes sense. We reply within two business days.
Prefer to message? Book on WhatsApp